Plate IV. Power generator site in the mid
foreground. View looking downstream with Parapara River on right
below Gorge on the alluvial plain of Glen. |
Removal and disturbance of regenerating bush in this area will be minimised to a six metre wide strip
around the building and two metres either side of the pipeline and access road route.
See also Plate VIII, Page 19.
No hazardous substances will be stored or processed as part of this scheme
and any oils or acids in batteries will be contained within their respective devices.
The rehabilitation or the construction of these aspects of the scheme involves the following components in
the respective catchments: - |