Parapara Hydroelectric Scheme Homepage       Botany Assessment Report.. page 9             contents
 

Figure3. The approximate route of the proposed pipeline, showing secondary native bush on the Glen Gyle right bank, somposed mainly of mamaku tree ferns, mahoe and hutu.

Figure4. Detail of the vegetation showing Hakea serices and gorse, with mamaku, manuka and hutu.

return to top  /   previous page  /   next page